Guide to setting up and creating your first automation project
A project groups everything belonging to one site: the single line diagram, the panel schedules, the I/O list and the commissioning records. Setting it up properly at the start saves rework later, because every drawing and test record produced afterwards inherits the project reference.
Have the approved single line diagram and the load schedule to hand. Without them the panel ratings cannot be fixed, and any configuration entered now will need revisiting.
Once the project is saved, ECS engineering reviews the entered ratings against the attached drawings and raises any discrepancy before manufacturing begins. That review is where missing data gets caught, so it is worth completing every field rather than leaving placeholders.